Work camp for the Site C dam is a self-contained town called Two Rivers Lodge, with restaurant, theatre, lounge, gym, yoga studio and hair salon. The camp is budgeted at $470 million to build and operate. (BC Hydro)

Site C review begins province-wide hearings

Horgan wants independent report on whether to keep building dam

The B.C. Utilities Commission is expected to issue a preliminary report on the $8.8 billion Site C dam project today, as it begins hearings around the province on the third dam on the Peace River.

Site C has been under construction for two years, currently employing more than 2,000 people for the early stages of the most expensive construction project in B.C. history.

Energy Minister Michelle Mungall said Wednesday she expects the BCUC to release its report by the end of the day, as per the deadline given by the NDP government that was widely criticized as arbitrary and too short. A ministry spokesperson said the report isn’t expected until after business hours.

Mungall said she will not see the preliminary report until it is public and the decision on the fate of the dam will be made once the consultation is over.

The dam was a key issue in the May election, with former premier Christy Clark’s government signing major construction contracts in an effort to get the project past the point of no return. Premier John Horgan ordered the review immediately on forming a minority government, directing the BCUC to make recommendations whether to proceed, pause or pull the plug by Nov. 1.

Public input sessions begin Sept. 23 in Vancouver, with sessions in Kamloops, Kelowna, Nelson, Prince George, Hudson’s Hope and Fort St. John. The last hearings are set for Nanaimo Oct. 10 and Victoria Oct. 11.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Parksville-Qualicum home prices skyrocket

Benchmark price jumps 16 per cent in Parksville Qualicum Beach

Kiosk designed to help residents, visitors of Parksville Qualicum Beach

Parksville chamber hopes this to be first of many

Site C dam goes ahead, cost estimate now up to $10.7 billion

Premier John Horgan says Christy Clark left him no other choice

Corfield Street construction starts in Parksville

Crews will avoid shopping centre disruptions during Christmas

Me Too At Work: Sexual assault and harassment in the B.C. workplace

Introducing an in-depth look at who is affected and what can be done

Proposed snowmobiles along Sicamous roads concern RCMP

RCMP, ICBC and province not yet on-board with proposed off-road bylaw in the B.C. Interior

‘Assemble your own meal’ kits grow into $120M industry in Canada

Kits offer a middle ground between eating out and grocery shopping

Millennials closing in as B.C.’s biggest wine drinkers

Generation X leads the way in current consumption of B.C. wine, as more wine drinkers are enjoying local varietals

Canadians lag behind Americans in giving to charity

Only one-in-five Canadians donated to charities in 2017

Police continue to seek missing Qualicum Beach woman

Oceanside RCMP requesting public assistance in locating Carmel Georgina Gilmour

Pair of pubs in Nanaimo scrap straws

VIU Students’ Union Pub, Dinghy Dock Pub no longer put straws in drinks

One man in hospital following targeted shooting in Courtenay

A 57-year-old Courtenay man is in hospital with a gunshot wound following… Continue reading

B.C. children adoption rates lagging, despite increased funding: watchdog

More than 1,000 children children are still waiting to be adopted, new report shows

Most Read