Smart meter installer photographs a sign opposing replacement of mechanical power meter

Smart meter refusal fees trimmed

BC Hydro customers who cling to mechanical power meters will continue to pay $32.40 a month for manual meter readings

BC Hydro customers who refuse to part with their mechanical power meters will continue to pay $32.40 a month for manual meter readings, with a refund on the balance of the $35 they’ve been paying since December.

The B.C. Utilities Commission ruled on BC Hydro’s smart meter opt-out fees Friday, after an order from the B.C. government required the regulator to approve fees covering all of BC Hydro’s costs.

A $20 a month charge will continue for BC Hydro customers who accept a digital meter with the radio transmission function turned off. The commission cut the one-time fee for disabling the meter radio to $22.60, far below BC Hydro’s proposed $100.

Most of BC Hydro’s nearly two million customers now have fully functioning smart meters, which send daily readings to a collection network and signal when power goes out and comes back on.

A few customers cling to theories that the meters present a health hazard, despite evidence that their signals are weaker than the natural background of radio frequency signals even in remote areas.

BC Hydro’s meter upgrade was exempted from review, but the commission ruled last year on similar equipment for FortisBC’s electrical grid in the Okanagan and Kootenay regions.

Commissioners rejected testimony from smart meter opponents, noting that their spokesmen were unqualified and in most cases repeating false or exaggerated claims in order to sell solutions to the purported hazards.

BC Hydro spent nearly $1 billion to upgrade its grid, forecasting savings from automatic meter reading to faster detection of outages and elimination of power theft from meter bypasses.

The commission also reduced fees for customers who move and request a radio-off meter at their new address. To switch from a mechanical meter to a radio-off meter will cost $77.60, reduced from the BC Hydro’s proposed $100. Going from one radio-off meter to another will cost $132.60, down from the proposed $155 that includes activating the meter in the former residence.

 

Just Posted

Assessments needed before Parksville beach cleanup could get green light

Permits, reviews would cost city an estimated $164,000

Joint effort helps extinguish shop fire in Coombs

Firefighters quickly contain blaze that spread to nearby trees

Parksville’s Kurz runs 160 kilometres in less than 24 hours

Former Ballenas athlete raises more than $8,000 for Terry Fox Foundation

Island farmers concerned with Agricultural Land Reserve changes

Dozens voice concerns at special meeting in Nanoose Bay

Parksville resort fire caused by flammable gas used to extract oil from cannabis

Investigators detail reasons for explosion and blaze that destroyed building

VIDEO: ‘Avengers: Endgame’ to be re-released with new footage

‘Avatar’ holds global box office record at $2.788 billion, while ‘Endgame’ stands at $2.743 billion…

B.C. teen killed by falling tree near Victoria

Second youth also injured in freak incident during field trip at Camp Barnard near Sooke

Elias Pettersson wins Calder Trophy as NHL’s top rookie

Vancouver forward first Canuck to win award since Pavel Bure in 1992

RCMP allows officers to grow beards

Members can now wear beards and goatees, as long as they’re neatly groomed

Scorpion gives birth after hitching ride in B.C. woman’s luggage

A Vancouver woman inadvertently brought the animal home from a trip to Cuba

30 years later: B.C. woman uses sidewalk chalk to reclaim site of her sexual assault

Vancouver woman didn’t think her powerful story, written in chalk, would ignite such support

FVRD chair calls B.C. incineration plan for Philippines waste ‘disturbing’

Metro Vancouver ‘uniquely capable’ of safely disposing of waste coming back to Canada, say officials

VIDEO: Acknowledging skeptics, finance minister vows to build Trans Mountain project

Bill Morneau said he recognizes ‘huge amount of anxiety’ in Calgary over future of oil and gas sector

Shovels could be in the ground on Trans Mountain by September, CEO says

Ian Anderson points to weeks likely required for NEB to reinstate 2016 regulatory record

Most Read