Smart meter installer photographs a sign opposing replacement of mechanical power meter

Smart meter refusal fees trimmed

BC Hydro customers who cling to mechanical power meters will continue to pay $32.40 a month for manual meter readings

BC Hydro customers who refuse to part with their mechanical power meters will continue to pay $32.40 a month for manual meter readings, with a refund on the balance of the $35 they’ve been paying since December.

The B.C. Utilities Commission ruled on BC Hydro’s smart meter opt-out fees Friday, after an order from the B.C. government required the regulator to approve fees covering all of BC Hydro’s costs.

A $20 a month charge will continue for BC Hydro customers who accept a digital meter with the radio transmission function turned off. The commission cut the one-time fee for disabling the meter radio to $22.60, far below BC Hydro’s proposed $100.

Most of BC Hydro’s nearly two million customers now have fully functioning smart meters, which send daily readings to a collection network and signal when power goes out and comes back on.

A few customers cling to theories that the meters present a health hazard, despite evidence that their signals are weaker than the natural background of radio frequency signals even in remote areas.

BC Hydro’s meter upgrade was exempted from review, but the commission ruled last year on similar equipment for FortisBC’s electrical grid in the Okanagan and Kootenay regions.

Commissioners rejected testimony from smart meter opponents, noting that their spokesmen were unqualified and in most cases repeating false or exaggerated claims in order to sell solutions to the purported hazards.

BC Hydro spent nearly $1 billion to upgrade its grid, forecasting savings from automatic meter reading to faster detection of outages and elimination of power theft from meter bypasses.

The commission also reduced fees for customers who move and request a radio-off meter at their new address. To switch from a mechanical meter to a radio-off meter will cost $77.60, reduced from the BC Hydro’s proposed $100. Going from one radio-off meter to another will cost $132.60, down from the proposed $155 that includes activating the meter in the former residence.

 

Just Posted

Development cost charges considered to fund regional parks

DCCs to assist in funding land acquisitions and development

Parksville powerlifter qualifies for world championships

Buhler sets personal bests in both raw and equipped lifting events

Wires left dangling after van crashes into hydro pole in Dashwood

Road closed while BC Hydro crews dealt with situation

Police go on hunt for distracted drivers in Parksville Qualicum Beach

One motorist ticketed for not wearing a seatbelt and using a cellphone while driving

Motorists attempted CPR on victim in fatal Highway 4 crash west of Whiskey Creek

Witnesses say three vehicles involved in collision; man in 70s confirmed dead

Sparks fly as SUV speeds down wrong side of Highway 1 trying to flee RCMP

Captured on video, the vehicle headed westbound against oncoming traffic before crashing

Trudeau to campaign in Nanaimo on Monday

Prime minister to support Nanaimo-Ladysmith candidate Michelle Corfield

Bobrovsky perfect as Blue Jackets blank Canucks 5-0

Vancouver shut out for 10th time this season

Trudeau in Vancouver to support Tamara Taggart at Liberal nomination event

The former broadcaster is seeking the nomination for the Vancouver Kingsway riding

Fundraising campaign launched for man caught in SilverStar avalanche

In only two days, the GoFundMe surpassed its $15,000 goal

Terror at sea: Helicopter rescues frightened cruise passengers in Norway

The Viking Sky cruise ship was carrying 1,300 passengers and crew when it experienced engine trouble

Search and rescue team helicopters injured climber from B.C. provincial park

A 30-year-old woman suffered a suspected lower-limb fracture in Skaha Bluffs Provincial Park

DOJ: Trump campaign did not co-ordinate with Russia in 2016

Attorney General William Barr said special counsel “does not exonerate” Trump of obstructing justice

Trudeau calls May 6 byelection for B.C. riding of Nanaimo-Ladysmith

The riding opened up when Sheila Malcolmson resigned in January

Most Read